Get In Touch With Us For A Quotation

Solar Savings Calculator

Solar Savings Calculator

Know Your Savings and Affordability

ResidentialCommercial

Current Electricity Usage i

kWh

Desired Solar System Size

kWp

★ Recommended

Desired Installment Term

Mths

Current electricity bill

RM222.15

New electricity bill

RM23.06

Monthly savings

RM199.09

Estimated cost

RM22,000.00

Easy Payment
Installment (0% p.a)

RM1,833.00

Per Month

Net Investment
For Installment Term

RM1,633.91

Per Month

90%Savings
per mth

Protecting Our Planet Starts With You

Solar PV installed5 kWpSolar PV installed
Carbon Dioxide4Carbon DioxideMetric tonnes avoidance per year
Tree Seedlings83Tree SeedlingsTrees grown for 10 years
Passenger Cars1Passenger CarsCars taken off road for 1 year

Disclaimer
This solar calculator provides an indicative estimate only and is not a quotation, guarantee, or bill prediction; calculations are based on your inputs and simplified assumptions including estimated solar generation, an assumed self-consumption ratio (for example, 70% self-consumed and 30% exported), and a standard billing period; for Solar ATAP scenarios, any export credit shown is an estimate and may be limited by programme rules and billing constraints (including MAQ and monthly netting/eligibility conditions) and may be valued using an assumed SMP or credit rate that can vary by billing cycle and market conditions; this estimate may exclude or simplify bill components including but not limited to fixed charges, maximum demand charges (where applicable), ICPT/AFA adjustments, retail surcharges, levies, SST, penalties, and other service-related fees; actual savings, bill amounts, and payback period may differ materially due to consumption patterns, site conditions, equipment performance, installation design, approvals, and changes in tariffs or programme terms; buySolar makes no warranties and accepts no responsibility or liability for any loss or decision made based on this calculator, and users should refer to their official TNB bill and obtain a site assessment and formal proposal for accuracy.